Lab Power Supply Update

So i got in and did a bit more work on the lab power supply. Finished off marking out and drilling every hole for every component so i do not have to go back and make a mess inside when i start to wire things up. Other than 2 tie bars across the top, the lower half of the case was done in the image below.

 

Mounted the switch mode PSU into the case, its held in with 4 M5 bolts and is not going anywhere, the fused, switched power connector and EMI filter are also bolted in with M5 bolts. The earth wire will be bolted to the case also with M5 bolts as well as serrated washers, so it cannot go anywhere. Go over the top on safety is my motto.

 

Mounted all the front panel items. From here its now just a matter of wiring up the spaghetti and making it all work together. But that will be another day, i do not think i have any wire suitable for 240v ATM and will need to go and get a meter of 3 core to pull apart for the internal wiring.

Facebooktwitterredditpinterestlinkedin

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.